Featured Project
Industrial Hydraulic Dredging Client Confidential

Industrial Pond Maintenance Dredging

Continuous Production. Data-Driven Performance.

A long-term hydraulic dredging operation moving 700,000 cubic yards of material since 2017, tracked daily with DREDGEPACK technology.

Submit Project Details
700,000CY
Material Volume
60,000BDT
Annual Production Target
2017
Operating Since
1.25+MI
Pumping Distance
Daily
Production Tracking
Project Overview

A large-scale, ongoing hydraulic dredging operation involving 700,000 cubic yards of material and an annual production target of 60,000 bone dry tons. Since 2017, C&M Dredging has utilized a swinging-ladder cutter suction dredge to transport material more than 1.25 miles through a booster pump station to a Dredged Material Management Area (DMMA), actively managed by C&M.

Through continuous monitoring and detailed production tracking, C&M records daily dredging volumes, material densities, and GPS-based progression maps using DREDGEPACK technology. This data allows the project team to optimize dredging operations, manage material placement, and minimize impacts on the facility’s overall treatment system. The project demonstrates C&M’s ability to deliver consistent, long-term dredging performance through precise execution, proactive management, and technology-driven decision-making.

Have A Complex Project?

Bring us the conditions, constraints, and project goals. We’ll help determine the right path forward.