Featured Project
Construction & Mining Site Development

Skysail Development Fill Dredging

Transforming Existing Resources Into New Possibilities.

Cut-and-fill dredging that built a 1,200-unit community from three existing lakes — without conventional dewatering, excavators, or haul trucks.

Submit Project Details
1,200
Unit Development
980
Acre Parcel
1.2M
Cubic Yards Dredged
6–21'
Dredge Depth
1 Mile
Max Pump Distance
Project Overview

In 2020, Neal Communities contracted C&M Dredging to help develop a 980-acre parcel with several existing lakes, a significant fill requirement, and a high water table — conditions that made conventional dewatering and excavation cost-prohibitive.

C&M Dredging worked alongside the developer to perform the bulk of the cut-and-fill requirements without conventional dewatering, excavators, or haul trucks. The plan called for dredging 1,200,000 cubic yards of virgin sand and rock to multiple disposal locations using a 14-inch hydraulic dredge, with material depths ranging from 6 to 21 feet and pump distances reaching up to one mile.

Cutting virgin material from three existing lakes on the parcel, C&M used the dredged material as fill to match the project design for the 1,200-unit residential development. We designed, constructed, and managed discharge pits to maintain fill requirements and meet project goals — meeting every cut, fill, and compaction specification set by the project team with no off-site discharge, no significant weather delays, and no environmental compliance issues.

Have A Complex Project?

Bring us the conditions, constraints, and project goals. We’ll help determine the right path forward.